A huge build-up of holiday traffic caused headaches for drivers on the A82 on Loch Lomondside on Monday.

Delays of one hour, 20 minutes were being experienced on a 10-mile southbound stretch between Inverbeg and Cameron House Hotel.

Traffic Scotland tweeted that the delay was due to the volume of traffic and not as a result of an incident.

LATEST HEADLINES: First images released of controversial £30m Loch Lomond development

Tailbacks were first reported shortly after 3pm, and as the queues reached their peak, traffic was slow for a 13-mile stretch of the road between 5pm and 6pm.

The queues did not start to ease until after 8.30pm.

LATEST HEADLINES: Helensburgh turns out in force to back 'save the pier' campaign

Delays were reported on the lochside stretch of the trunk road at various points throughout the Easter weekend as day-trippers and weekend holidaymakers travelled to and from the bonnie banks, Argyll and the west Highlands.